Design advisory

Healthy Building Design

Healthy building design is dramatically cheaper at RIBA Stages 2–3 than it is post-handover. We embed IAQ, ventilation and wellbeing into design decisions before they harden.

  • RIBA Stage 2–4 input
  • Material and finish review
  • Ventilation strategy review
  • Daylight & glare review
  • WELL / BREEAM gap analysis
  • Post-occupancy evaluation

What design input covers

Façade and ventilation strategy, low-emission material specification, daylight and glare strategy, acoustic strategy, and an embedded wellbeing brief tied to WELL or BREEAM targets.

Who this is for

Facility managers, property managers, HR and wellbeing leads, health & safety teams, workplace consultants and building owners, plus design teams (architects, M&E) wanting an independent wellbeing peer-review.

How we work with design teams

Stage-gate reviews aligned to RIBA stages, signed-off comment trackers, and post-handover monitoring to verify design intent has actually been delivered.

Frequently asked questions

Are you architects?
No — we are independent IEQ consultants brought in alongside the design team.
Do you cover refurbishments?
Yes — refurbs are where wellbeing decisions create the most leverage.
Can you support planning?
Yes — overheating, IAQ and ventilation evidence for planning conditions.

Add wellbeing to your design

Talk to us about RIBA-stage support.

Book a consultation